Notifications Centre
Live operational alerts across the Caloris Basin Extraction Complex.
Critical
1
Warning
2
Info
2
Success
2
Severity
Category
Refinery throughput target met
Sol output reached 1,284 t — 4% above target for the current cycle.
Drill head over-torque — auto-shutdown engaged
Torque exceeded 240 kN·m for 12 s. Rig 07 halted and isolated pending inspection.
Solar Array B output below threshold
Output 7.4 MW vs 9.0 MW target. Dust accumulation suspected on panels 12–18.
Hauler 3 battery margin low
State of charge 16%. Re-route to charging bay C recommended within 40 min.
Solar Array A maintenance complete
Panel cleaning on Array A finished; output restored to 9.2 MW.
Shift B handover complete
Refinery throughput nominal. 1,284 t logged for the sol so far.
Deep Space Network window opens 15:10
Telemetry uplink to Earth scheduled. Buffered logs will flush automatically.